BOUFARIK POWER PLANT II

HESAP : GAMA POWER
KARGO : Field Erected Tank
HACİM :

265 Pckgs // 1100Mts // 1450 Cbm

YÜKLEME TARİHLERİ : APRIL 2015
TESLİM YERİ : Tenes, Algeria
YÜKLEME YERİ : Derince, Turkey

PROJE KAPSAMI

• Acceptance of the Cargo at Derince Port.

• Unloading of Cargo from Lowbed into Store Area.

• Loading of Cargo to Chartered Vessel.

• Arranging all Lashing /Dunnage /Securing of Cargo on Board.

• Sea Transportation ex Derince Port to Tenes Port by Vessel.

• Discharging of Cargo at Tenes.

• Delivery of Cargo at Job Site.