BOUFARIK POWER PLANT I

ACCOUNT : GAMA POWER
CARGO : Steel Structures
VOLUME :

153 Pckgs // 450Mts // 1200 Cbm

SHIPMENT DATES : OCTOBER 2014
PLACE OF DELIVERY : Mostaganem, Algeria
PLACE OF RECEIPT : Ankara, Turkey

SCOPE OF PROJECT

• Pre Carriage from Factory to Port.

• Acceptance of the Cargo at Derince Port.

• Unloading of Cargo from Lowbed into Store Area.

• Loading of Cargo to Chartered Vessel.

• Arranging all Lashing /Dunnage /Securing of Cargo on Board.

• Sea Transportation ex Derince Port to Mostaganem Port by Vessel.

• Discharging of Cargo at Mostaganem.

• Delivery of Cargo at Job Site.