QATAR PROJECT

KONTO : HBK CONTRACTING / ERKIZ
FRACHT : World Cup Stadium
VOLUMEN :

Steel Construction 2lotsx 90//487mts//1100Cbm LxWxH : 19000 x 3000 x 3500 mm // 48000 KGs each

SENDUNGSDETAILS : JULY, AUGUST 2018
AUSLIEFERUNGSORT : Hamad, Qatar
EMPFANGSORT : Gaziantep, Turkey

AUSMAß DES PROJEKTES

• Pre Carriage from Factory to Port.

• Acceptance of the Cargo at Iskenderun Port.

• Unloading of Cargo from Lowbed into Port Storage Area.

• Arranging Loading into Chartered Vessel.

• Arranging all Lashing /Dunnage /Securing of Cargo on Board.

• Sea Transportation ex Iskenderun Port to Hamad Port by Vessel.

• Discharging Cargo from Vessel at Hamad Port.