HESAP | : | ABB ELETRICS |
---|---|---|
KARGO | : | Transformer |
HACİM | : | 55 pckgs// 150 mts // 350 Cbm each LxWxH : 6200 x 3000 x 430 mm // 84000 KGs each |
YÜKLEME TARİHLERİ | : | JANUARY 2017 |
TESLİM YERİ | : | Alba Jobsite, Bahrain |
YÜKLEME YERİ | : | Istanbul, Turkey |
• Pre Carriage from Factory to Port.
• Acceptance of the Cargo at Derince Port.
• Unloading of Cargo from Lowbed into Port Storage Area.
• Arranging Loading into Chartered Vessel.
• Arranging all Lashing/Dunnage/Securing of Cargo on Board.
• Sea Transportation ex Derince Port to Khalifa Bin Salman Port by Vessel.
• Discharging Cargo from Vessel at Khalifa Bin Salman Port.
• Arranging Custom Clearance.
• Arranging Transportation to JobSite ALBA.
• Discharging Cargo and Instatalion via Skid & Jacking method.