BATI Innovative Logistics Project Team is busy on the port of Derince loading Drilling Machinery to China. Unpacked cargoes have been carefully loaded from the Port of DERINCE after a sensitive load plan. Total cargoes were over 1000 Cbms and more than 400 tons and the longest drilling units were 17 meters long and 35tons each.