BOUFARIK POWER PLANT II

ACCOUNT : GAMA POWER
CARGO : Field Erected Tank
VOLUME :

265 Pckgs // 1100Mts // 1450 Cbm

SHIPMENT DATES : APRIL 2015
PLACE OF DELIVERY : Tenes, Algeria
PLACE OF RECEIPT : Derince, Turkey

SCOPE OF PROJECT

• Acceptance of the Cargo at Derince Port.

• Unloading of Cargo from Lowbed into Store Area.

• Loading of Cargo to Chartered Vessel.

• Arranging all Lashing /Dunnage /Securing of Cargo on Board.

• Sea Transportation ex Derince Port to Tenes Port by Vessel.

• Discharging of Cargo at Tenes.

• Delivery of Cargo at Job Site.