ALBA PROJECT MAYSUN

ACCOUNT : ABB ELETRICS
CARGO : Transformer
VOLUME :

55 pckgs// 150 mts // 350 Cbm each LxWxH : 6200 x 3000 x 430 mm // 84000 KGs each

SHIPMENT DATES : JANUARY 2017
PLACE OF DELIVERY : Alba Jobsite, Bahrain
PLACE OF RECEIPT : Istanbul, Turkey

SCOPE OF PROJECT

• Pre Carriage from Factory to Port.

• Acceptance of the Cargo at Derince Port.

• Unloading of Cargo from Lowbed into Port Storage Area.

• Arranging Loading into Chartered Vessel.

• Arranging all Lashing/Dunnage/Securing of Cargo on Board.

• Sea Transportation ex Derince Port to Khalifa Bin Salman Port by Vessel.

• Discharging Cargo from Vessel at Khalifa Bin Salman Port.

• Arranging Custom Clearance.

• Arranging Transportation to JobSite ALBA.

• Discharging Cargo and Instatalion via Skid & Jacking method.